Swimming Pool Construction

Excavation for a vinyl-lined pool is a job for an experienced operator. Normally the side excavation is approximately two feet beyond the finished pool perimeter to allow for assembly and a concrete footing to be installed.

 

The second step includes the assembly of the polymer wall panels and stairs, coping receptor, skimmer, and inlets as well as suction and return plumbing.

 

Most builders pour the concrete decking once all of step two is completed but in some cases and with certain water table situations, the liner will be installed before the decking is poured. The pool structure is strong enough to allow installation to proceed in either manner.

 

Hanging the liner is the next step but it must be a warm & sunny day to be able to stretch it in place!

 

Fill it with water and enjoy all of the health, fitness, and entertainment value of a spectacular poolscape in your backyard!

 

 

Above Ground Pools are a bit simpler and go a bit faster!

 

The bottom is graded and smoothed with sand.  Once smoothed the walls are rolled out and locked into place.

 

Once walls are up a felt pad goes down for extra protection.

 

Then the liner is hung and water goes in.

 

Then you are ready to enjoy your above ground swimming pool!